完工证明等确认函模版.doc
信函Letter项目名称Project:合肥京东方B3项BOEHF合同包号CP:编号Ref No: 日期Date: 致To: 自From: 抄送Cc: 标题Subject: Taking-Over Certificate(TOC) and Relevant IssuesRequired Reply:□Yes■No承包商针对原协议金额(或被认可的更改协议金额)在办理有关包含筹建费的全部项目量的工程款时室内九游体育竣工函,必须附上项目移交证书(完工证明)。The contractor must submit the Taking-Over Certificate (or Acceptance Certificate, hereinafter collectively referred to as the “Taking-Over Certificate”) in case that he applies for the full payment of the contract amount (or revised contract amount approved by the Employer) together with such payment application. 与下列事宜相关联室内九游体育竣工函,指定分包商在办理相关分包工程的有关包含开办费的全部项目量的工程款时,须填写以下才能完成项未完成的相关说明资料(在下面1到10项中只限于与本身工作内容相关的个别)。
In case of nominated subcontractor, he shall submit the written confirmation and supporting document as specified, if applicable among items 1 to 10 below, which prove the completion of his works when he applies for full payment of the contract amount (or revised contract amount approved by the Employer). 项目移交证书(完工证明)中所明示的完成日期与协议工期(或Key Date, 或安装就位的期限)相比有推迟时,必须对工期提早的合理性提出说明并获得认同。对于未经认可的工期延后,业主可以从项目款中收取合同里明示的延期补偿金(或罚金)。If the completion date specified in the Taking-Over Certificate is behind the completion date (or Key Date, or Date of Set-up on Position) of the contract the Employer may deduct corresponding amount for delayed time as Liquidated Damages (or Penalty) stated in the contract unless otherwise the contractor obtains the approval for the extension of time. 以缺失整改记录(NCR)或其它程序模式指明的施工品质已满足规定或承包商不执行指示等缺失,承包商须书面说明其改变结果。
对于无法说明的个别装饰公司,业主可以从项目款中缴纳相应的总额。Unless otherwise the contractor shall prove by written the improvement against issues raised by NCR or any other document in relation to the deficiency of quality or incompliance with instruction, the Employer may deduct the corresponding amount to such issues as is not proved by written in their improvement.承包商应按照协议条约尽早申请并取得工程移交证书(完工证明)九游体育效果图,并对过于此项工作而造成的项目款支付延期等将自负全责。The contractor shall apply for the Taking-Over Certificate in due course and receive the Taking-Over Certificate on time. Any consequences including delay of payment caused by negligence of applying and receiving the Taking-Over Certificate shall be fully under the contractor’s responsibilities. 请各包商在办理移交证书时填写以下应当完成项未完成的相关说明资料(只限于与本身工作内容相关的个别):The contractor shall submit the written confirmation and supporting document proving the completion, if applicable, together with application of the Taking-Over Certificate as follows:剩余工作完成确认函(Punch List上获得施工、管理企业及居民的有关确认完成的盖章认可后递交);Confirmation of outstanding works completion (submit Punch List of outstanding works inspected and signed by Jianli, Engineer, and Employer upon completion thereof); 项目法定竣工(与政府认证相关)所提出的全部资料递交确认函 (使用附件中的标准格式“Form TOC-a”);Confirmation of document submission required for project statutory completion (use attached “Form TOC-a”); 各类报验、检测资料(含监理、政府管理部门涉及内容)提交确认函(使用附件中的标准格式“Form TOC-b”);Confirmation of inspection and test report submission statutorily required including document required by Jianli (use attached “Form TOC-b”); 设备、材料批准及进场报验资料(提交现况表);Material and equipment approval document including inspection record of their delivery to project site (submit status); 各类书面文档内容的处理结果资料(提交现况表);Document proving settlement of issues raised by various correspondence exchanged in relation to the contract works (submit status); 竣工图纸提交确认函(使用附件中的标准格式“Form TOC-c”);Confirmation of As-built Drawing submission (use attached “Form TOC-c”); 工程培训完结确认函(使用附件中的标准格式“Form TOC-d”);Confirmation of Training completion (use attached “Form TOC-d”); 各类调试及试运行(包含报告及记录)完成及保护手册和甲供设备的全部相关资料递交确认函(使用附件中的标准格式“Form TOC-e”);Confirmation of Test & Commissioning completion, including record and report thereof, submission of O/M Manual, and all document received from manufacturer of the equipment supplied by the Employer (use attached “Form TOC-e”);压力容器及附件、压力管道等审批程序;Submission of Government Certificate for pressure vessel; 其它规定提交的资料。
Other submission as required by the Engineer;Attachment: 标准格式“Form TOC-a”标准格式“Form TOC-b”标准格式“Form TOC-c”标准格式“Form TOC-d”标准格式“Form TOC-e”发文者 签名 Sender Signature: 收文者 签名 Receiver Signature:抄送 Copy to: ■BOE□PM■Design Team■Jianli■MC(标准格式 Form TOC-a) 编号Ref.: 日期Date : 2010-09-09项目名称Project: 第6代薄膜晶体管液晶显示器件(TFT-LCD)项目地址Location : 中国合肥新站综合开发试验区Employer: 合肥京东方光电科技有限公司Engineer: 世源科技工程有限公司/ 现代综合设计(韩国)Designer: 世源科技工程有限公司/ 现代综合设计(韩国) Jianli: 合肥工大建设监理有限责任公司项目开工资料递交确认函 合同包号:CP No.:BOEHF-CP-004(B)工作范围:Contract Works:1、桩基础工程;2、余土清理到指定标高3、PE膜覆盖及素砼垫层;4、桩头破除、清理及外运;5、配合桩基检测工作提交日期:Date of Submission:2010年9月9日备注 :Remarks:中国有限公司在此证实:以上合同工程相关的项目法定完工(与政府认证相关)所提出的全部资料未于下列日期按照协议条约及国家要求完成了提交工作。
We hereby confirm that all the document necessary for Project Statutory Completion with relation to the Contract Works hereof has been satisfactorily submitted as of the Date of Submission specified hereinabove in accordance with the requirements of the Contract and Regulation of P.R.C.确Confirmed by:总承包商项目中国建筑一局(集团)有限责任公司(标准格式 Form TOC-b) 编号Ref.: 日期Date : 2010-09-09项目名称Project: 第6代薄膜晶体管液晶显示器件(TFT-LCD)项目地址Location : 中国合肥新站综合开发试验区Employer: 合肥京东方光电科技有限公司工程师Engineer: 世源科技工程有限公司/ 现代综合设计(韩国)设计单位Designer: 世源科技工程有限公司/ 现代综合设计(韩国) Jianli: 合肥工大建设监理有限责任公司报检及检测报告递交确认函 合同包号:CP No.:BOEHF-CP-004(B)工作范围:Contract Works:1、桩基础工程;2、余土清理到指定标高3、PE膜覆盖及素砼垫层;4、桩头破除、清理及外运;5、配合桩基检测工作提交日期:Date of Submission:2010年9月9日备注 :Remarks:桩基设备验收;桩基定位报验;桩基施工记录;检验批质量验收记录;钢筋加工记录;砼配合比;PE膜施工回填;素砼垫层施工验收;钢筋原材料进场;钢筋原材料试验报验;钢筋连接实验报验等各项验收工作。
中国有限公司在此证实:以上合同项目相关的各种报验、检测资料(含监理、政府管理部门涉及内容)已于下列日期按照协议条约及国家要求完成了提交工作。We hereby confirm that all kinds of Inspection and Test Report statutorily required including document required by the Jianli with relation to the Contract Works hereof has been satisfactorily submitted as of the Date of Submission specified hereinabove in accordance with the requirements of the Contract and Regulation of P.R.C.确Confirmed by:监理工程合肥工大建设监理有限责任公司(标准格式 Form TOC-c) 编号Ref.: 日期Date : 2010-09-09项目名称Project: 第6代薄膜晶体管液晶显示器件(TFT-LCD)项目地址Location : 中国合肥新站综合开发试验区Employer: 合肥京东方光电科技有限公司Engineer: 世源科技工程有限公司/ 现代综合设计(韩国)Designer: 世源科技工程有限公司/ 现代综合设计(韩国) Jianli: 合肥工大建设监理有限责任公司竣工图递交确认函 合同包号:CP No.:BOEHF-CP-004(B)工作范围:Contract Works:1、桩基础工程;2、余土清理到指定标高3、PE膜覆盖及素砼垫层;4、桩头破除、清理及外运;5、配合桩基检测工作提交日期:Date of Submission:2010年9月9日备注 :Remarks: 桩基竣工图中国有限公司在此证实:以上合同项目相关的完工图纸已于此类日期按照协议条约及国家要求完成了提交工作。
We hereby confirm that the As-built Drawing with relation to the Contract Works hereof has been satisfactorily submitted as of the Date of Submission in accordance with the requirements of the Contract and Regulation of P.R.C.确Confirmed by:设计单位项目世源科技工程有限公司/现代综合设计(韩国)编号Ref.: 日期Date : Project: 第6代薄膜晶体管液晶显示器件(TFT-LCD)项目Location : 中国东莞新站综合开发试验区Employer: 合肥京东方光电科技有限公司Engineer: 世源科技工程有限公司/ 现代综合设计(韩国)APPLICATION FOR TAKING-OVER CETRTIFICATE Key DateDescription of Works referenced to Key Date 2009.7.133#(Module)桩基项目工程(垫层,PE膜铺设,保护层).Attachmengt1sheeetsSubmitted by:Project Manager(标准格式 Form TOC-e) 编号Ref.: 日期Date : 项目名称Project: 第6代薄膜晶体管液晶显示器件(TFT-LCD)项目地址Location : 中国合肥新站综合开发试验区Employer: 合肥京东方光电科技有限公司Engineer: 世源科技工程有限公司/ 现代综合设计(韩国)Designer: 世源科技工程有限公司/ 现代综合设计(韩国) Jianli: 合肥工大建设监理有限责任公司设备安装及试运行/维护手册等递交确认函 合同包号:CP No.:工作范围:Contract Works:提交日期:Date of Submission:备注 :Remarks:中国有限公司在此证实:以上合同项目相关的各种调试及试运行(包含报告及记录提交)/维护手册和甲供设备的全部相关资料的递交已于下列日期按照协议条约及国家要求完成。
We hereby confirm that Test and Commissioning including report and record thereof, submission of O/M Manual, and all document received from manufacturer of the equipment supplied by the Employer in relation to the Contract Works hereof has been satisfactorily completed as of the Date of Completion specified hereinabove in accordance with the requirements of the Contract and Regulation of P.R.C.确Confirmed by:建设单位工程合肥京东方光电科技有限公司项目编号:SY-09516-GG 6/9GF-001-01 (Rev.01)1/8